5cf9cad94714c5577919c266171d935c

  • Project Completion: 2011
  • Location: San Marcos, California

VODA worked with the TERI organization to develop standards for a new campus in San Diego County, California in 2011. Serving a very specific and sensitive population, adults and children with autism, the campus will serve as an educational and vocational campus for the entire southern California region. With safety and interaction with nature at the core of the projects goals, the campus will also feature an organic farm and will be built to the highest standards of energy efficiency.

TERI Landscape Design References 4